Bottom planking dry fitting

3 out of 4 sections of the bottom planking have now been dry fitted. The front section took a lot of hard work, with lots of planing required to get a good fit. I also needed to do a lot more fairing of the frame in some areas. There is still a lot of overhanging edges that will need trimming down too.

Here is a close up of the transition joint